«Bois, charbon de bois et ouvrages en bois; liège et ouvrages en liège; ouvrages de sparterie ou de vannerie»
Pays | |
La direction de la | |
Pays | |
Période | |
Sélection de produits |
Période | Somme |
---|---|
2019 | $1.9 M |
Total: | $1.9 M |
Période | Poids, tonnes. |
---|---|
2019 | 7.28 k |
Total: | 7.28 k |
Famille de produits | 2019 | 2019 | ch. | ∑ (2019-2019) | Part |
---|---|---|---|---|---|
09 44: Bois, charbon de bois et ouvrages en bois | $1.8 M | $1.8 M | 0% | $1.8 M | 96.6% |
09 45: Liège et ouvrages en liège | --- | --- | --- | --- | 0% |
09 46: Ouvrages de sparterie ou de vannerie | $64.2 k | $64.2 k | 0% | $64.2 k | 3.4% |
Total: | $1.9 M | $1.9 M | $1.9 M |
№ | Pays | ∑ (2019-2019) | Part |
---|---|---|---|
1 | Chine | $3.54 Md | 38.1% |
2 | Finlande | $533 M | 5.7% |
3 | Japon | $467 M | 5% |
4 | Ouzbékistan | $438 M | 4.7% |
5 | Allemagne | $367 M | 4% |
6 | Kazakhstan | $324 M | 3.5% |
7 | Bélarus | $320 M | 3.4% |
8 | Égypte | $309 M | 3.3% |
9 | États-Unis | $194 M | 2.1% |
10 | Azerbaïdjan | $190 M | 2% |
11 | Estonie | $177 M | 1.9% |
12 | Danemark | $152 M | 1.6% |
13 | Pologne | $150 M | 1.6% |
14 | Royaume-Uni | $138 M | 1.5% |
15 | Pays-Bas | $132 M | 1.4% |
... | ... | ... | ... |
76 | Maroc | $2.3 M | 0% |
77 | Bosnie-Herzégovine | $2 M | 0% |
78 | R.A.S. chinoise de Hong Kong | $1.9 M | 0% |
79 | Pérou | $1.8 M | 0% |
80 | Pays inconnu | $1.8 M | 0% |
... | ... | ... | ... |
Le total de tous les pays: | $9.29 Md | 100% |
№ | Région | ∑ (2019-2019) | Part |
---|---|---|---|
1 | Habarovskiy kray | $1.2 M | 61.4% |
2 | Novgorodskaya oblast | $329 k | 17.3% |
3 | Moskva | $129 k | 6.8% |
4 | Permskiy kray | $117 k | 6.1% |
5 | Krasnoyarskiy kray | $53.7 k | 2.8% |
6 | Sverdlovskaya oblast | $38.3 k | 2% |
7 | Moskovskaya oblast | $26.8 k | 1.4% |
8 | Sankt-Peterburg | $16 k | 0.8% |
9 | Kostromskaya oblast | $13.6 k | 0.7% |
10 | Rostovskaya oblast | $8.15 k | 0.4% |
11 | Krasnodarskiy kray | $1.83 k | 0.1% |
12 | Kaliningradskaya oblast | $596 | 0% |
13 | Novosibirskaya oblast | $540 | 0% |
14 | Chuvashiya | $212 | 0% |
Dans toutes les régions: | $1.9 M | 100% |